Skip to content
IH2O Ltd.

Installation

Professional installations.

Our certified installers handle the full job. We shut off and drain the supply, cut in the plumbing, fit the bypass and drain line, set the control valve for your water, and pressure test everything before we pack up. Then we walk you through the system so you know how it runs. We service what we sell, so the same local team is there afterwards.

What installation day looks like.

  1. 01

    Confirm the plan

    We review your water test results, the equipment selected, and exactly where it will sit before a single tool comes out.

  2. 02

    Isolate and tie in

    We shut off and drain the supply, cut in the connections, and fit the bypass and drain line so the system can be serviced later.

  3. 03

    Commission and test

    We pressurize, check every joint, program the control valve for your water, and run the first regeneration cycle before leaving.

  4. 04

    Walk you through it

    We show you the bypass, the salt fill, the display, and the service schedule, then answer whatever you want to ask.

Let our experts test the water in your home.

Free, no obligation, and it takes about 30 minutes.

Call nowBook free test